The Nepisiguit (Grand) Falls generating station is a hydroelectric dam built in the Canadian province of New Brunswick and is operated by NB Power corporation.
[1] The hydroelectric power dam was constructed in a year and a half by 400 men.
[2] It was first projected when the Great Falls Water Power and Boom Co. acquired the interests in the north-east bank of the river from the Dominion of Canada.
[2] Its power house has as of 2016 a capacity of 11 megawatts from its three turbines.
[3] It is located in Bathurst Parish, Gloucester County.