[1] The Kozloduy NPP operates two pressurized water reactors with a total output of 1906 MW.
Construction of the Belene Nuclear Power Plant was officially terminated in March 2012, and a thermal powerplant was supposed to be built on the site.
As of 2022[update], Bulgaria plans to construct new reactors at the existing Kozloduy site,[3] and at Belene.
[4] Bulgaria has the Kozloduy Nuclear Power Plant with two pressurized water reactors (together 2000 MW net).
[5] Bulgaria has a state agency in charge of radioactive waste disposal.