Two 7-car trainsets were built by Nippon Sharyo between 2017 and 2018, replacing the 7000 series "LSE" sets.
[2] Two seven-car trainsets were built by Nippon Sharyo, with the design overseen by Noriaki Okabe Architecture Network.
[4] Individual cars are equipped with electro-hydraulic full-active suspension to minimize lateral vibration.
[7] The trains primarily operate on the Odakyu Odawara Line between Shinjuku in Tokyo and Hakone-Yumoto in Kanagawa Prefecture.
[4] Initial details of the trains on order were published by Odakyu on 20 October 2016.