Ohio State Route 762

The highway has its western terminus at a signalized intersection with the concurrency of U.S. Route 62 and SR 3 just 0.25 miles (0.40 km) south of the village limits of Harrisburg.

SR 762 heads south for about 0.3 miles (0.48 km) before it makes a left turn to cross the Big Darby Creek where it enters Scioto Township.

SR 762 continues east on a slightly realigned former township road to the south of the community of Duvall passing over CSX and Norfolk Southern rail lines on a new overpass.

[8][9] The project began construction in 2013 with funding from a $16 million Transportation Investment Generating Economic Recovery Federal grant.

[11] Future improvements associated with the overall project include the construction of roundabouts at the Duvall Road / Ashville Pike and the SR 762 / Rickenbacker Parkway intersections and a diamond interchange with US 23.