Pakistan Atomic Energy Commission

[8] Until 2001, the PAEC was the civilian federal oversight agency that manifested the control of atomic radiation, development of nuclear weapons, and their testing.

[12] Research at PAEC initially followed a strict non-weapon policy issued by then-Foreign Minister Sir Zafarullah Khan.

[13] In 1958, Abdus Salam of the University of the Punjab also joined the commission, along with Munir Ahmad Khan who initially lobbied for acquiring an open pool reactor from the United States.

[12] Financial investment for the Karachi Nuclear Power Plant was provided by the Economic Coordination Committee, and Edward Durell Stone was commissioned to oversee the architectural design of PINSTECH.

[12] in 1969, the United Kingdom Atomic Energy Authority, agreed to supply a small scale nuclear reprocessing plant, with the capacity to extract 360 grams of plutonium per year.

[12] After India's decisive victory in the Indo-Pakistani War of 1971, Pakistan retracted its non-weapon policy and the research and development of nuclear weapons began in 1972.

[18] Since its establishment in 1956, the PAEC has provided a conspicuous example of the benefits of atomic age technologies for the advancement of agriculture, engineering, biology, and medicine.

[22] The PAEC supports its university-level physics program at the Government College University, Lahore where it awards fellowships to the students.

The PAEC continues to promotes its program as "peaceful uses of atomic energy commenced for the benefit the scientific community as well as public.

[25] Since 1974, the PAEC has been a key organizer and sponsor of the International Nathiagali Summer College on Physics and Contemporary Needs conference each year where scientists from all over the world are delegated to the country.

[26] The Summer College disseminates the knowledge of advancements in physics, chemistry, biology, astronomy, mathematics, computer science, logic, and philosophy.

PAEC has also established Centers for Retired Employees Welfare (CREW) in Lahore, Islamabad and Karachi for meetings, discussions and problems solving.

PAEC is held responsible for design preparation and proper operational function of Pakistan's commercial nuclear power plants.

Providing policy guidance to the government, PAEC's studies envision setting up power plants with a capacity of approximately 8800 Megawatts by 2030.

[29] During the 1980s, some of the experimental physicists from Pakistan, specialising in the technique of Solid State Nuclear Track Detectors (SSNTD), also benefited from CERN by exposing the stacks in the beam at the Super Proton Synchrotron (SPS).

[32] In 1997 PAEC chairman Ishfaq Ahmad reached out to CERN to sign a contract between them after elaborate discussions an in-kind contribution worth one million Swiss francs for the construction of eight magnet supports for the Compact Muon Solenoid (CMS) detector.

[33] It was PAEC's efforts that led the Pakistan Institute of Nuclear Science and Technology (PINSTECH) with CERN's direct cooperation in the area of radioprotection.

[35] According to the news sources, the team of Pakistani scientists were keenly involved in the development of the Large Hadron Collider— the world's largest and highest-energy particle accelerator.

Chaghi Monument at Faizabad in Islamabad
PAEC took participation in the development of Large Hadron Collider .