This is an article about the 3 main paper mills in Aberdeen, Scotland (some closed).
Since its closure in 2001 (with the loss of approximately 250 jobs), all the mill buildings have been cleared, and the site has been redeveloped as an "urban village" The mill was developed to produce off-machine coated grades of paper.
In 2016 a hydro electric turbine was installed on the site by Aberdeen Community Energy (www.acenegy.org.uk).
The installation revealed an old lade which had previously delivered water to the paper mill.
[2] However, in September 2022, it was announced that the mill has gone into the administration, making 301 out of 372 staff members redundant.