Peregrino

The temperature of the oil, gas, water and sand from the field is 79.6°C in the reservoir and 60-66°C on arrival in the ship, and then heated to 130-150°C for processing (separation).

However, with the current reservoir depletion plan of the field calling for the use of produced water injection and rock compaction, Peregrino's recovery factor has increased to 20%.

[3] The first phase of the development includes two drilling and wellhead platforms and a ship-shaped floating production, storage and off-take unit (FPSO) called Maersk Peregrino built in Singapore.

With the current reservoir depletion plan of the field calling for the use of produced water injection and rock compaction, Peregrino's recovery factor has increased to 20%.

[needs update] APL (a subsidiary of National Oilwell Varco) will provide the submerged turret production and mooring system for the Peregrino FPSO.

Kiewit Offshore Services was selected for the engineering, procurement, and construction of the two large 6,500-ton decks and two jackets, 6,600 and 7,000 tons respectfully.

Wood Group Brasil was selected by Statoil to provide operations, maintenance and modification services for the two Peregrino wellhead platforms.