Rail transport in Western Australia

The Western Australian lines developed in narrow 3 ft 6 in (1,067 mm) gauge from Fremantle (the port of Perth), Geraldton, Bunbury, Albany and Esperance, mainly for carrying grain and minerals, with the private Midland Railway Company and Great Southern Railway adding 3 ft 6 in (1,067 mm) gauge lines in the Wheatbelt with the support of land grants.

[10][11] The WAGR's remaining functions, including owning the rail network and operating regional passenger services were transferred to the Western Australian Government Railways Commission.

[12][13] On 1 January 2003, the commission's functions were absorbed by the Public Transport Authority with passenger services operated under the Transwa brand.

May and Gray's History of Passenger Carriages chapters offer an insight into a set of decades or slightly longer stages of railway development.

[15] Private railways for carrying timber were built south of Perth from Lockville (just north of Busselton) to Yoganup in 1871, and from Rockingham to Jarrahdale soon after.

The first government railway in the State was a 3 ft 6 in (1,067 mm) gauge line between Geraldton and Northampton and was opened in 1879 to transport lead and copper to port.

[21] Four isolated heavy duty railways for the cartage of iron ore in the Pilbara region have always been private concerns operated as part of the production line between mine and port.

[25] In 2010, Rio Tinto announced plans to expand capacity on the railway line linking its iron ore mines to Dampier; this would increase capacity to 230 million tonnes (510 billion pounds) per year, to meet increasing demand for iron ore.[26] The railway lines are: In March 2010 the Perth City Link Rail Master Plan was published, within; the increasing operational and capacity requirements demanded from the city's public transportation system by the community was acknowledged, and a robust framework outlining steps, to be taken by the Public Transport Authority of Western Australia, to meet these demands was established.

[27] The rail system in Perth has not always attracted the level of government resources and support from the community which it now receives (evinced in the recent Master Plans targeting its expansion).

This minor war between road and rail over land reserve in Perth culminated in 1983 with a group of people, including Professor Peter Newman, defending the public transport corridor.

[28] 3 years later, in 1986, the first Master Plan for the rail system was prepared, and in 1988, the public, planners and policy-makers were outspoken in their preference for a new rail system to link Perth to the Northern suburbs, instead of the decidedly short-term solution of a bus-way advocated by the consultants commissioned to find the most affordable transit solution.

[29][30] The progression of public, planner and policy-maker attitudes in Perth, away from automobile and road infrastructure dependence, according to one researcher, has led to the following familiar scene in the city:[28] Far from the segregation of land uses advertised by Hoyt in 1943, the turn toward the expansion of the Perth rail system has also been accompanied by the advancing of New Urbanism leaning "Liveable Neighbourhood" policies, promoting mixed density development, walkable communities and sustainable transportation, potentially demarcating a departure from automotive city planning features for the city.

NR class hauled Indian Pacific departs Perth passing a narrow gauge Transperth suburban train to the left, both trains are on dual gauge track
The locomotive Ballarat in the sand at Wonnerup , 1921. Reputed to be the oldest in Western Australia, the engine now sits in St Marys Park, Busselton .
Railway construction circa 1926, Western Australia
Modern S class diesel locomotive on a bauxite train at Wellard .
Australian Railroad Group 1600 class locomotives at Forrestfield.
A loaded BHP Billiton Iron Ore train at Boodarie, near Port Hedland . An FMG iron ore train is just visible in the background at right.