Reading TMD

With the rebuilding of Reading Station and the remodelling of the track, the depot was moved from the wye to a brand new facility located on the other side (to the north) of the main running lines, next to the fields where the Reading Festival is held each year.

This new depot opened in mid 2012 and is home to GWR's fleet of Class 165 and 166 Network Turbos.

As part of the construction, the preliminary equipment for electrification of the Great Western Main Line was installed.

The Depot will also be managed by GWR and Bombardier to carry out light maintenance/heavy maintenance and overhauling of the Electrostar fleet.

The site is being used as part of the southern approach to the new flyover for primarily fast passenger trains so that their movements do not conflict with freight trains coming from Southampton along the future Electric Spine.