Red Bank Catholic High School

Red Bank Catholic High School has 88 full and part-time teachers, nine administrators, six guidance counselors, a campus minister (Charles Gates) and a chaplain.

He was a firm believer in the involvement of youth in the community and wanted to make sure that kids had organized programs to foster learning and fitness.

[21] The 1976 team defeated Notre Dame High School by a score of 41–6 in the Parochial A South sectional championship game.

[22] The 2014 team won the NJSIAA Non-Public Group III sectional championship by a score of 45–20 over Delbarton School in a game played at MetLife Stadium in East Rutherford.

[23] The team won the Non-Public Group III title in 2018 with a 14–10 win against Mater Dei High School.

[28] The 1996 team won the Non-Public A title with a 60–33 win against DePaul[29] before advancing to the Tournament of Champions as the top seed, winning the semifinals 52–43 against fifth-seeded Rumson-Fair Haven Regional High School and defeating number-two seed Elizabeth High School 39–31 in the finals to finish the season[30][31] The 2001 girls' basketball team won the Group A state championship with a 56–39 win over Paramus Catholic High School.

[32] The girls basketball won the South A state sectional championship in 2007 with a 60–53 win against Camden Catholic High School in the tournament final.

[37] The baseball team won the Non-Public Group B state championship in 1997, defeating Montclair Kimberley Academy in the tournament final.

[41] The field hockey team won the Central Jersey Group II state sectional title in 2002.

[42] The 2002 men's ice hockey team won the Handchen Cup Championship / Southern A Conference Championship with a 7–5 over Middletown High School South, and won again in 2008 and 2011; the hockey team was the Dowd Cup Champion in 2005 and the Shore Conference Tournament champion in 2014.

[47] Construction on a new athletic facility takes the place of the recently demolished Sternweiss building that was knocked down in the summer of 2008.

[citation needed] This building will be mainly a Student Center with numerous facilities for education, sports, and fitness.

The new 31,000 square feet (2,900 m2) student center now houses a 2,200-square-foot (200 m2) fitness center, two classrooms, locker rooms and proper storage space which will house the Alumni Hall of Fame and trophies and includes infrastructure upgrades such as a new heating system for the entire plant that was completed in September 2007 and is expected to result in significant savings in heating costs.