Line 1 of Surat Metro also known as The Red Line (Line 1) is an under-construction metro rail line of the Surat Metro, a rapid transit system in Surat, Gujarat, India.
This line consists of 20 metro stations from Sarthana to DREAM City with a total distance of 21.61 km.
15.14 km of this distance will be elevated and 6.47 km underground.
It is expected to be operational by December 2027.
[2][3] Following is a list of stations on this route: