Ribblehead Viaduct

The land underneath and around the viaduct is a scheduled ancient monument; the remains of the construction camp and navvy settlements (Batty Wife Hole, Sebastopol, and Belgravia) are located there.

[2] [3][4][5][6] In the 1860s, the Midland Railway, keen to capitalise on the growth in rail traffic between England and Scotland, proposed building a line between Settle and Carlisle.

[7] The company's chief engineer, John Sydney Crossley and its general manager, James Joseph Allport, surveyed the line.

[7] From this date, the viaduct was constructed by the Midland Railway who worked on a semi-contractual basis overseen by William Ashwell.

[7] They lived, often with their families, in temporary camps, named Batty Wife Hole, Sebastopol, and Belgravia on adjacent land.

[13][7] Ribblehead Viaduct is 440 yards (400 m) long, and 104 feet (32 m) above the valley floor at its highest point,[12] it was designed to carry a pair of tracks aligned over the sleeper walls.

[8] The viaduct is faced with limestone masonry set in hydraulic lime mortar and the near-semicircular arches are red brick, constructed in five separate rings, with stone voussoirs.

Ribblehead railway station is less than half a mile to the south and to the north is Blea Moor Tunnel, the longest on the line, near the foot of Whernside.

For safety reasons, the line was reduced to single track across the viaduct to avoid the simultaneous loading from two trains crossing and a 20mph speed limit was imposed.

[7] According to Michael Portillo, who took the decision in his capacity as Minister of State for Transport, the economic arguments for closing it had been weakened by a spike in passenger numbers, and further studies by engineers had determined that restoration work would not be nearly as costly as estimated.

[7] Between September 1999 and March 2001, a programme of improvements was implemented involving renewal of track, replacement of ballast and the installation of new drainage.

[17] During 2016, the line carried seven passenger trains from Leeds to Carlisle per day in each direction,[18] and long-distance excursions, many hauled by preserved steam locomotives.

Timber trains, and stone from Ingleton quarry, pass over the viaduct when they depart from the yard opposite Ribblehead railway station.

[20] Limestone aggregate trains from Arcow quarry sidings (near Horton-in-Ribblesdale) run to various stone terminals in the Leeds and Manchester areas on different days – these trains reverse in the goods loop at Blea Moor signal box because the connection from the quarry sidings faces north.

[21] Major restoration work started in November 2020 as a £2.1 million project to re-point mortar joints and replace broken stones got underway.

Sunrise over the viaduct