River Loxley

The Loxley valley provided the initial course of the Great Sheffield Flood, which happened after the Dale Dyke Dam collapsed shortly before its completion in March 1864.

Drinking water for the people of Sheffield was provided by five small reservoirs on a site close to Langsett Road.

[2] The company soon started other major projects, and Strines Reservoir was completed in 1869, covering 54 acres (22 ha) and impounding 453 million gallons (2,059 Megalitres (Ml)) of water.

Agden Reservoir was completed in the same year, which covered 62 acres (25 ha) and held 559 million gallons (2541 Ml).

[3] The river has played an important part in the industrial history of Sheffield, as it descends through 280 feet (85 m) in the 6 miles (9.7 km) between Low Bradfield and the Don, and this has enabled many mills, forges and cutlers wheels to be powered by its waters.

[6] Low Bradfield Corn Mill is the earliest known installation, being recorded in documents from 1219, when it was transferred to Worksop Priory.

Development after 1720 was rapid, and a shift to heavier industry occurred from the early 19th century, with forges replacing cutlers wheels, or in some cases being built alongside them.

[8] The upper river valley is now the site of Damflask reservoir, built in the 1870s, but not completed until 1896, due to problems with leakage.

There are several components that are used to determine this, including biological status, which looks at the quantity and varieties of invertebrates, angiosperms and fish.

Like most rivers in the UK, the chemical status changed from good to fail in 2019, due to the presence of polybrominated diphenyl ethers (PBDE), perfluorooctane sulphonate (PFOS) and mercury compounds, none of which had previously been included in the assessment.

The reservoirs at the upper end trap sediments, and prevent the recharge of gravel beds further downstream.

[17] Subsequently, the Don Catchment Rivers Trust commissioned the engineers Arup Group to assess how fish migration could be encouraged.

Partial removal of the weir was not thought to be appropriate in any of the cases, and only the option of easement was considered for Loxley Old Wheel.

[21] In September 2014 Sheffield Council announced plans to create a flood alleviation programme in the Upper Don Catchment area, including the River Loxley.

[22][23] The first phase of the Upper Don Flood Alleviation Scheme was completed in October 2023 with the removal of a weir on the River Loxley and the construction of a series of walls.