[1] On the conversion to electric operation, the depot was extensively rebuilt in 1905 enlarging the tram shed from two roads to six.
The depot was enlarged again around 1913 at the rear with an additional four roads.
As a former cable tram depot the layout included an attached winding house and boiler house.
The winding house was built for the cable tramway from the foot of King Street to Ocean Street, Edgecliff.
Modified design included:[2] In January 1934, the former winding house was redeveloped as a trolleybus depot.