The walls of the redesigned hydrogen tank were machined in an orthogonal waffle-like pattern, providing more strength and stability than the previous design.
At hatch opening, Andy Thomas officially became a member of Discovery's crew, completing 130 days of living and working on Mir.
The transfer wrapped up a total of 907 days spent by seven U.S. astronauts aboard the Russian space station as long-duration crew members.
When the hatches closed for undocking at 9:07 am, 8 June, and the spacecraft separated at 12:01 pm that day, the final Shuttle-Mir docking mission was concluded and Phase 1 of the International Space Station (ISS) program came to an end.
On 3 June 1998 the crew was able to set up a bypass system that allowed AMS data to be downlinked via S-band/FM communications when the orbiter came within range of a ground station.