Seaton branch line

The small town of Seaton became a seaside holiday resort in the middle of the nineteenth century, although its historic port activity had declined to the use of fishing boats only.

However the difficult terrain of the Devon Coast in the area forced the L&SWR to align its route a considerable distance to the north.

Two alternative potential contractors fell by the wayside, and it was obvious that the available firms lacked the financial resources to undertake the work.

The planned opening for the summer season of 1867 was abandoned, but by 2 August 1867 a locomotive was found to be hired in to work on the construction.

Several small contracts were let for constructing buildings; an understanding regarding the supply of water to Seaton station was found to be unsatisfactory, and an alternative with Sir Walter Trevelyan had to be hastily arranged.

[4][page needed] When Yolland revisited for a second inspection on 19 February 1868, he was satisfied with all the minor issues except one, but the platforming arrangement at Colyton Junction was outstanding.

[4][page needed] At the end of February 1868 the Company received a letter from the L&SWR in which it declared its own objections, mainly connected with the provision of more durable structures.

Branch trains arriving at Colyton (later Seaton Junction) ran past the station towards Exeter to the point of convergence with the main line, and then reversed back into the down (westbound) platform.

)[2][page needed] In the three and a half months to 30 June 1868, the line had only earned £300 from "coaching" and £43 from goods; the L&SWR retained £155 and the Company received £145.

On summer Saturdays after 1949 there was considerable extra traffic on the line, with two locomotives together operating nine-coach trains with through coaches to and from London.

[4][page needed] The original track on the branch was 65 lbs per yard flat bottom rail in 24 feet lengths fastened direct to cross-sleepers on 12 inches of ballast.

[1][page needed] The original powers for the Company had included the provision of a toll bridge over the River Axe to the east of Seaton station, giving access to the village of Axmouth.

[1][page needed] In 1927–1928, the Southern Railway (who had taken over the L&SWR at the Grouping of the railways in Great Britain) extended and improved the station facilities at Seaton Junction, providing through main tracks with the platform lines on loops; there was a new branch platform (opened on 13 February 1927), which branch trains could use without fouling the main line.

Colyford Station was demolished to make way for a tramway passing loop and siding, with just the old Gents WC remaining, although long since decommissioned.

File:Colyton on The Seaton Tramway in July 1982