Severn Beach railway station

A platform was built beside the line at Severn Beach by the Great Western Railway in 1922, and a bay platform added to the west for excursion traffic, with terminating passenger services from Bristol starting on 26 May 1924, subsequently extended to Pilning in a loop back to Bristol via Patchway from 9 July 1928.

The station master and keeper of the level crossing were also provided with houses, while to the east of the platform were sidings, primarily for stabling of excursion trains.

In November 1964 through services to Pilning ceased,[2] with the line north closed completely in July 1968, although goods traffic at Severn Beach had already ended in 1963.

The concourse and other station buildings have been demolished, replaced with a small metal and glass shelter, while the eastern rails have been pulled up, leaving just the bay platform remaining.

Most services from Bristol Temple Meads terminate at Avonmouth instead of continuing to Severn Beach, whilst those from Weston-super-Mare reach here.

[22][23] The scheme was given the go-ahead in July 2012 as part of the City Deal, whereby local councils would be given greater control over money by the government.

Severn Beach in 1981