The line is 277 km (172 mi) in length and is subordinate to the Shenyang Railway Bureau.
The line from Andong (now Dandong) to Fengtian (now Shenyang) was originally built by the Imperial Japanese Army as a 762 mm (30.0 in) narrow-gauge rail line during the Russo-Japanese War.
[1] Later, it was transferred to the South Manchuria Railway (Mantetsu), which named it the Anfeng Line (Anpō Line with the official Japanese name) after the two termini (Fengtian being pronounced Hōten in Japanese); the travel time for passenger trains between Andong and Fengtian was two days.
[1] In accordance with the agreement signed between Japan and China after the end of the war, work to convert the line from narrow to standard gauge began in August 1909 and was completed in October 1911.
The line was heavily damaged during the Pacific War; after the defeat of Japan, it was, along with all other railway lines in the territory of the former Manchukuo, taken over by the Soviet-controlled China Changchun Railway.