[7] An extension to Richmond planned in 1920 would have started here with the next stop at the closed London and South Western Railway station at Hammersmith (Grove Road); the work was never carried out.
As part of London Transport's New Works Programme, 1935 - 1940, escalators were installed to replace the original lifts and in 1938, the platforms were lengthened along with those of the other existing Central line stations to accommodate eight cars instead of the previous seven.
[11] The local MP for the Shepherd's Bush constituency, Andy Slaughter, investigated the project and obtained documents under the Freedom of Information Act which showed that the contractor, Metronet, had advised that the work could be completed without closing the station.
During the refurbishment, Transport for London did not add lifts to the station as originally planned, citing installation costs of £100 million due to the various underground utilities nearby which would have to be diverted.
The London Borough of Hammersmith and Fulham and disability pressure groups have been critical of the fact that the station remains inaccessible for those unable to use stairs.