Shuixi station (Chinese: 水西站; pinyin: Shuìxī Zhàn; Jyutping: seoi2sai1 zaam6), is an interchange station between Line 7 and Line 21 of the Guangzhou Metro.
[2] Shuixi Station was originally planned as the northern terminus of Line 4.
In order to cooperate with the express positioning of Line 21, this station was cancelled for a time; Later, the setting was resumed during the EIA stage, and construction was finally implemented.
[5] On 30 April 2019, the transfer to the '3 Powers' was completed on Line 21 of this station;[6] On 20 December of the same year, the station was opened with the opening of the remaining section of Line 21.
[7] In October 2023, the transfer to the '3 Powers' was completed at the Line 7 station.