[3] On 7 December 1964 British Railways withdrew passenger services from Steventon and all other intermediate stations between Didcot and Swindon.
[3] The station was demolished soon after closure and there is no evidence remaining, except for a house used briefly as the company headquarters of the Great Western Railway which still stands on the "up" (north) side of the line (see next section).
Steventon was briefly the headquarters of the GWR: in October 1841, the Board decided to merge the previously-separate London and Bristol committees.
Gandell (and subsequently built by him as contractor, after he resigned his post as Resident Engineer),[6] this building still survives on the north side of the line, set back slightly from the site of the station platforms.
After a delay of several months, during which the accommodation was made ready, the weekly board meetings were held at Steventon from 21 July 1842 until 5 January 1843, when the permanent headquarters was established at Paddington.