Sussex Route Utilisation Strategy

The recommendations are grouped into each strategic routes, and, as has become customary with RUSs, provide short-term (to end of Control Period 4, CP4, March 2014), medium-term (CP5, 2019) and some long-term (thereafter) solutions.

The key objective is eventually to increase the frequency and length of the trains which pass between north and south London, and therefore has much wider scope than the Sussex RUS area.

However, the initiative is recommended in the broader context (e.g. journey time improvements plus facilitating train lengthening) for implementation in CP5, though very poorly explained in the document (no detailed benefit/cost analysis).

Over and above like-for-like works, reducing the longest signalling headways between Billingshurst and Christ’s Hospital was appraised and found to be financially positive in respect of performance benefits alone, and hence recommended; it may also provide a small journey time improvement.

Strategic Freight Network initiatives are already underway in the area, particularly in respect of Class 92 electric locomotive operation, and are not further considered in the RUS.