TIV MPI Adventure is a 14,739 GT wind turbine installation vessel that was built in 2010 by Cosco Nantong Shipyard, China.
Equipment installed includes a crane which has a capacity of 1,000 tonnes (980 long tons) at 25 metres (82 ft) radius.
An auxiliary crane has a capacity of 160 tonnes (160 long tons) at 70 metres (230 ft) radius and a third crane has a capacity of 50 tonnes (49 long tons) at 25 metres (82 ft) radius.
[3] The naming ceremony was held on 19 January 2011 at Qidong, Jiangsu, China.
[5] MPI Adventure was used to install wind turbines in the London Array.