Taizhou Yangtze River Bridge

[5] The idea of multiple towers and the pylon suspension lines to connect them was to decrease the impact that river flow can have on the structure.

For example, a reasonable method of a wind resistance test was developed based on the unique structural integrity of the bridge.

With the daily traffic flow being at 30,000 on the bridge, the commute between Taizhou, Jiangsui and Changzhou has been reduced from 2 hours to 1.

However, these main lines are constantly exposed to harsh weathers which can affect its strength and longevity through erosion.

To address this issue, The Jiangsu Province Communications Planning and Design Institute Limited Company established a "dehumidification system".