been provided adjacent to the north side of the station offering a small amount of free car parking for rail users.
A fully accessible ramped footbridge links the two platforms - this was opened in July 2013 by Network Rail to replace the old barrow crossing, which had been the scene of several "near misses" prior to a passenger being injured by a passing train whilst trying to cross the line in January 2013.
The temporary structure erected immediately after the accident was then replaced by the current accessible bridge whilst the line was closed for repairs following the spoil tip collapse at Hatfield Colliery.
[4] Before the COVID-19 pandemic, Northern Trains ran an hourly service Monday-Saturday in both direction calling here between Doncaster and Scunthorpe.
One TransPennine Express service between Cleethorpes and Liverpool Lime Street each way also stops here, early morning westbound (06:06) and late evening eastbound (22:52).