The contract to build her was awarded to the Electric Boat division of General Dynamics Corporation in Groton, Connecticut, on 28 November 1983, and her keel was laid down on 24 October 1986.
On 1 March 2012, Miami arrived at the Portsmouth Naval Shipyard in Kittery, Maine, for a scheduled 20-month Engineered Overhaul (EOH) and system upgrades.
[8] One crew member suffered broken ribs when he fell through a hole left by removed deck plates during the fire.
On 23 July 2012, however, civilian painter and sandblaster Casey J. Fury was indicted on two counts of arson after confessing to starting the fire.
[17] In July 2012, Navy leaders asked Congress to add $220 million to the operations and maintenance budget for emergent and unfunded ship repairs.
[24] On 6 August 2013, the U.S. Navy announced its intention to decommission Miami, concluding the cost was more than it could afford in a time of budget cuts.