USS San Juan (SSN-751)

The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 30 November 1982 and her keel was laid down on 9 August 1985.

[6] The submarine established communications in the early morning hours of 14 March, and indicated that there were no problems; hence, units were able to stand down from the search and rescue that was already well underway.

San Juan and all subsequent boats in her class are quieter and incorporate an advanced AN/BSY-1 sonar suite combat system.

[8] On 19 March 1998 off the coast of Long Island, New York, the submerged San Juan collided with the surfaced fleet ballistic missile submarine USS Kentucky (SSBN-737).

[11] San Juan arrived at Portsmouth Naval Shipyard (PNSY), Maine, on 8 April 2010 for an engineered overhaul (EOH); for maintenance and system upgrades.

USS San Juan through-ice surface
San Juan in May 2007
San Juan undocking at PNSY, 2011