This class of submarine is unique in that it features the Photonics Mast Program (PMP) that freed ship designers to place the boat's control room in a lower, less geometrically constrained space than would be required by a standard, optical tube periscope.
It is additionally unique in the U.S. Navy for featuring all-digital ship and ballast control systems that are operated by relatively senior watchstanders and a pressure chamber to deploy SEAL divers while being submerged.
[5] North Carolina joined the fleet on 21 February 2008, after problems with the boat's steam valve and internal piping system had forced two delays in the acceptance of the vessel.
[6] Welding issues in the internal piping system scuttled a first-planned December 2007 delivery, and the discovery of an inadequate steam valve forced a further delay from January to February 2008.
During the transfer, the officers and crew of North Carolina conducted a series of exercises designed to test the boat's new combat systems and stealth capabilities.