Shubrick was laid down on 17 February 1942 by the Norfolk Naval Shipyard, Portsmouth, Virginia, launched on 18 April 1942, sponsored by Mrs. Grosvenor Bemis, great-great-granddaughter of R.Adm.
Reaching her destination, she prepared for Operation Husky and, on 10 July, provided fire support for the Amphibious Battle of Gela, Sicily.
There, during a night air raid on 4 August, Shubrick was hit amidships by a 500-pound (230 kg) bomb which caused flooding of two main machinery spaces and left the ship without power.
After completion of repairs and refresher training in January 1944, Shubrick made two convoy runs to Europe and back before joining the Normandy bombardment group in Belfast.
[1] She remained off the Normandy beaches for over a month, performing escort duties, fire support missions and anti-motor torpedo boat and anti-submarine patrols, with trips to England for replenishment.
After overhaul, Shubrick made a convoy trip to Taranto, Italy, and then conducted training along the east coast of the United States.
Shubrick underwent emergency repairs until 15 July, when she began the trip back to the United States on one engine, arriving at Puget Sound Navy Yard on 10 August.
Later sold to the National Metal and Steel Corporation, Terminal Island, Los Angeles, for scrapping, her hulk was removed on 28 September 1947.