[1] Work started on the triangular, nine-story, steel-framed building[2] in March 2012, with a completion date set in 2014.
[3] The facility was built to Energy Performance Certificate (EPC) "A" rating standards.
The building includes open-plan office spaces, three lecture theaters and areas for specialist laboratory equipment.
[4] Besides the Technology and Innovation Centre, a 5,000 m2 (54,000 sq ft) Industry Engagement Building, located nearby, accommodates 500 workers.
[citation needed] The research carried out at the centre by 850 researchers is focused on engineering, science, bio-nanotechnology, business, energy, health, technology and asset management.