The Upper Salmon Hydro Development is a hydroelectric plant in Newfoundland and Labrador.
It utilises a portion of the residual head between Meelpaeg Lake Reservoir and Round Pond within the watershed of the Bay d'Espoir Hydroelectric Development.
[1] The plant operates at a normal supply level of 241 m under a net head of 51 metres.
The unit, which is equipped with a Francis turbine, was first synchronized on January 19, 1983.
You can help Wikipedia by expanding it.This article about a Canadian power station is a stub.