As opposed to the city-run urban metro network, the Vienna U-Bahn, it extends beyond the borders of the city, is operated by the ÖBB (Austrian Federal Railways), and consists of many branch lines.
However, since other factors, such as military transports, long-distance traffic, etc., played an important role in their planning and the railway was operated with steam locomotives, it was not particularly successful.
When the Wildganshof [de] Gemeindebau housing estate in the 3rd district was built in 1931–33, it was designed so that an elevated passenger railway line intersecting diagonally between the apartment blocks would have been possible.
After the Anschluss of 1938, the Siemens Bau Union developed a combined U-Bahn and S-Bahn network with municipal offices, the latter intended to be operated by the Deutsche Reichsbahn.
[2] Planning for the mainline S-Bahn network for Vienna was started in 1954 as a part of reconstruction of the ÖBB and especially the Wien Südbahnhof.
The collapse of the investment budget of the city of Vienna led to a partial stop of construction in 1960, necessitating a postponing of the grand opening of the network by a little over a year.
Its official opening was attended by over 900 invited guests, including Federal President Adolf Schärf and Vice Chancellor Bruno Pittermann.
An agreement was concluded with Wiener Stadtwerke – Verkehrsbetriebe which allowed passengers to use other parallel modes of transport without additional ticket purchase in the event of a malfunction.
In 1963, the first television monitors for train handling were installed on a trial basis in the Südbahnhof stop (now Wien Quartier Belvedere).
[3] From the south to the north, the following stations are served: The Stammstrecke is expected to be extensively modernised, including a signalling upgrade to ETCS Level 2, between 2023 and 2027.
Originally part of Otto Wagner's federally operated Stadtbahn, this line was not taken over by the city with the rest of the network in 1925.
However, two of the present stations, Breitensee and Oberdöbling were demolished after the original line's closure and rebuilt in a different style by architects Alois Machatschek and Wilfried Schermann.
In addition to a complete renovation and large-scale grade-separation works, the two stations Hietzinger Hauptstraße and Stranzenbergbrücke are to be rebuilt.