The first stage consists of the proposed Mokskaya HPP, with a planned capacity of 1,200 MW, and an average annual production of c. 4.54 billion kWh.
[1] The second stage consists of the projected Ivanovo HPP, with a planned capacity of 210 MW, and an average annual production of c. 1.03 billion kWh.
The third stage: the projected Yangudinskaya HPP, with a planned capacity of 360 MW.
The fourth stage: the projected Karalonskaya HPP, with a planned capacity of 450 MW.
The sixth stage: the projected Bodaibo HPP, with a planned capacity of 600 MW.