[10] During November 2020, it was announced that the Austrian government had temporarily reintroduced subsidies on the Vienna - Salzberg route for multiple operators, including WESTbahn; this measures was taken largely in response to the economic consequences of the COVID-19 pandemic.
WESTbahn observed that this measure prevented further redundancies from becoming necessary amid the short term downturn in passenger travel during multiple national lockdowns.
[14] On 8 April 2022, WESTbahn expanded its service westwards into neighbouring Germany, initially operating four daily trains that served Munich East station and München Hauptbahnhof beyond Salzburg.
[20] By 2013, the company's fleet consists of seven Stadler KISS bilevel trains, each with six coaches, a total length of 150 metres, a top-speed of 200 km/h, acceleration of 0.85 m/s² and a capacity of 501 leather seats.
[24] In June 2021, WESTbahn confirmed that it was working with CRRC Zhuzhou to develop additional rolling stock that it planned to lease to supplement its KISS fleet.
[26] The CRRC EMUs will constitute six-car units, comprising two motor and four trailer cars, possess a maximum speed of 200km/h, and be capable of operating under both 15kV and 25kV AC overhead electrification.
Each six-car unit will have 571 seats grouped into two classes, and be equipped with vending machines, wheelchair and bicycle storage areas, and onboard WiFi.
[27] On 5 June 2012, CEO Stefan Wehinger, a former ÖBB director, resigned on diverging views about the company's strategy and sold his stake in WESTbahn.
[28] The board of directors includes Benedikt Weibel (Chairman), Hans Peter Haselsteiner, Erhard F. Grossnigg and Frank Bernard.