The Waldpolenz Solar Park is a 52-megawatt (MW) photovoltaic power station built by German developer and operator Juwi at a former military air base near Leipzig, Eastern Germany.

When completed by the end of 2008, it was the world's largest thin-film solar park using CdTe-modules.

[2] The solar park was then extended with another 153,650 panels, also provided by First Solar, to a final capacity of 52 MWP in 2011[3] The installation is located in the Muldentalkreis district in the state of Saxony in eastern Germany, built on half of the location's 220 hectares (543.6 acres)[4] in the townships of Brandis and Bennewitz.

[5] The investment costs for the Waldpolenz solar park have amounted to some 130 million euro.