[citation needed] Refurbishments include the construction of two multi-storey car parks and restoration of a third, the relocation of the bus terminal, the extension of the Shopping Centre on the north-east side, and general improvements to the inside appearance of the shopping locations.
In May 2005, the first major stage of development was completed, with the opening of Coles, as well as many other smaller shops in a corridor towards Target.
This included the refurbishment of the entrances, and general appearance of the walkways.
Part of this development included the opening of two multi-storey car-parks on the south-western side.
The second stage of development was officially completed on 8 March 2007, with the opening of Big W. This included a number of smaller shops, and a restored car-park on the north-eastern side.