Weifang–Laixi high-speed railway

[2][3] The line is 126 kilometres (78 mi) long and has a design speed of 350 kilometres per hour (220 mph), though initially services are running at 300 kilometres per hour (190 mph).

The final set of rails were installed on 9 May 2020.

It passes to the south of Changyi and to the north of Pingdu city.

South of Laixi city, the line meets the Qingdao–Rongcheng intercity railway.

This People's Republic of China rail-related article is a stub.