Remetinec Roundabout

The roundabout itself is elevated from the ground level and two tram lines and several pedestrian tracks pass underneath it.

[2][5] More than 2,700 accidents with 216 injuries were registered in the roundabout between 1997 and 2006, making it one of the city's most dangerous intersections.

[4][5] A traffic study commissioned by the City of Zagreb in 2007 proposed five reconstruction options.

[3] The option proposed in 2009 and ultimately accepted is based on construction of two east–west-bound tunnels, reducing the load on the roundabout to 38,000 vehicles per day.

[3][6] The reconstruction began in the summer of 2018 and is expected to be open for traffic on 9 January 2020.

Roundabout in west Novi Zagreb