White Rose Project

This project would have been the first coal-fired power plant to demonstrate the use of oxy-fuel technology for low-carbon electricity at a competitive cost.

[2] The proposed 426 MW plant was expected to send 2 Mt CO2/year to an offshore saline aquifer, achieving 90% capture.

[3] The rejection was on the basis that the project had no route to funding, following the UK government cancelling a carbon capture and storage competition in November 2015.

Due to reduced renewable energy subsidies from the UK government, Drax announced the withdrawal of its investments to begin after the Front End Engineering Design (FEED) studies were completed in 2015, but promised to continue providing land as well as site services and infrastructure.

[6] The BOC Group would be responsible for the delivery and maintenance of the air separation unit for the coal-fired power plant.