The station is managed by South Western Railway, which also operates all trains serving it, and it is located in Travelcard Zone 4.
Under Transport for London's (TfL) initial plans for Crossrail 2, it was proposed that those would stop only at certain hub stations.
[8] A petition for Worcester Park to be a designated stop, signed by 1,129 signatories, was presented to the Mayor of London on 15 January 2014.
[9] In October 2015, TfL announced a set of local consultations would take place and their amended proposal provides that Crossrail 2 trains will now stop at all stations on the routes to the south and west of Wimbledon.
The result is that Crossrail 2 trains should now stop at Worcester Park although construction of the line is currently on hold due to a lack of available funding.