The interchange, also referred to as “Yishun Integrated Transport Hub (ITH)” opened on 8 September 2019.
The original Yishun Bus Interchange was built at a cost of S$2 million, and it opened on 23 August 1987.
On 27 February 2015, the Land Transport Authority (LTA) announced the construction and co-location of a new air-conditioned bus interchange with the new Northpoint City integrated development, named the Yishun Integrated Transport Hub (YITH).
As such, to make way for a new Integrated Transport Hub (ITH), the old bus interchange transferred operations to a temporary site at the junction of Yishun Central and Yishun Central 1 behind Northpoint Shopping Centre on 14 March 2015.
[4][5] Since 5 September 2021,[6] Yishun Bus Interchange is managed by Tower Transit on a five-year term.