[1] The bridge connects the west bank area of Zaporizhzhia with the north side of Khortytsia Island by spanning the smaller eastern branch of the River Dnieper.
In addition, during the construction of DniproHES-2, the road on top of the dam would be blocked, which would also increase the traffic on the temporary bridge.
The new bridge would span from the western bank of the Dnieper to the northern side of the mid-river island Khortytsia.
It would provide access to the Preobrazhensky Bridge near the southeast end of the island, which crossed the wider east channel of the Dnieper.
The assembly and installation were conducted by the Construction Bridge Brigade #12, led by Precinct Chief Zalyubovsky.
[2] On September 13, 2019, route 1 (Square of Trade Unions - Khortytsia Tourist Camp) was opened, with Dnipro T203 trolleybuses with the option of autonomous operation.