[2] Commanded by Colonel David E. Pergrin, it earned a Presidential Citation for its performance in the Ardennes, blowing up bridges and fighting as infantry in helping stunt the German advance towards Antwerp.
[3]: 202 After nearly a month of grueling counter measures against the initial Panzer forces led by Joachim Peiper, the battalion's C Company returned to Malmedy to discover the bodies of 86 murdered US GIs frozen under a thick blanket of snow on 14 January 1945.
Headquarters First United States Army, 18 February 1945, as approved by the Commanding General, European Theater of Operations, is confirmed under the provisions of section IV, Circular No.
On 17 December 1944, at the beginning of the German Ardennes break-through, the 291st Engineer Combat Battalion was assigned the mission of establishing and manning roadblocks south and east of Malmedy, and with the defense of the town itself.
Repeated attacks were made by enemy armor and infantry on roadblocks and defensive positions and, in each instance, were thrown back with heavy losses by the resolute and determined resistance.
The determination, devotion to duty, and unyielding fighting spirit displayed by the personnel of the 291st Engineer Combat Battalion, in delaying and containing a powerful enemy force along a route of vital importance to the Allied effort, are worthy of high praise.