Adriatic LNG terminal

The terminal facility was built in Campamento, parish of San Roque, Spain, then towed to Porto Levante, Italy.

The pipeline that connects to the terminal is located south of the Levante Po River mouth near Scanno Cavallari.

[4] After construction was completed in Campamento, the rig was towed by four tugboats to its current location off the coast of Rovigo.

[3] The flotilla traveled the 1,700 nautical miles (3,100 km; 2,000 mi) in 16 days to reach the site.

[5] When it arrived, the terminal was weighted down by water to ensure it was permanently positioned on the seabed.