In terms of its location in relation to a metropolis, the plant lies 140 kilometres (87 mi) west of Thessaloniki, a major city in northern Greece.
In 1993, PPC awarded the contract for the supply and installation of Unit V to the consortium of the companies Ansaldo GIE (consortium leader – Italy, at present (2008) Ansaldo Energia a Finmeccanica Company), Austrian Energy and Environment SGP/Waagner-Biro GmbH (Austria) and AEGEK (Greece).
Main steps of the contract execution were: In May 1995, a 6.6 Mw earthquake shook the area with a maximum Mercalli intensity of VIII (Severe), which affected the progress of the work.
Object of the contract between PPC and the Consortium was the design, engineering, manufacture, supply, transportation, installation, testing, putting in operation and delivery of one lignite-fired steam electric unit of 350 Mwe plus 70 MWth in the Agios Dimitrios plant, including the design, engineering, construction and supervision of the civil works.
The project included the following main equipment, systems and works: Greek companies as ASPATE S.A., Mekasol, Metka e Rodax participated in the construction of the unit as subcontractors of the three consortium members.