As River

With the opening of the northern delivery tunnel of the Lesotho Highlands Water Project in 1998, the once tiny stream was transformed to a strong-flowing river.

[2] As of 2004, 18 cubic meters of water was released per second,[1] and the river's flow is consequently not seasonally variable.

[4] The automated and low maintenance Stortemelk Hydropower Project at the Botterkloof Dam is set to contribute a further 4.4 MW to the power grid, starting July 2016.

[3][5] The opening of the northern delivery tunnel in 1998 caused physical and chemical changes to the river, as water volumes increased and water temperature decreased, scouring of the river channel occurred, and much silt was deposited in Saulspoort Dam.

Recovery of invertebrates was only noticeable some kilometers downstream, and the weirs proved ineffective when water is released in high volumes.

The As River Outfall of the Lesotho Highlands Water Project , situated 9 km north of Clarens , was opened in 1998.