Ashgabat–Turkmenabat Motorway

[5] VCE Vienna Consulting Engineers ZT GmbH (Austria) was contracted by Türkmenawtoban CJSC in 2019 to oversee the quality control of the Ashgabat–Turkmenabat motorway project.

[11] Subcontractors include individual enterprises such as Nusaýýollary and Hyzmat Merkezi, along with joint-stock companies Edermen and Altyn Nesil, which are responsible for various construction stages and the development of essential infrastructure along the motorway.

[14] The road surface is made of high-quality asphalt concrete and modern materials, enhancing the strength and load-bearing capacity of the motorway.

[14] Facilities such as parking lots, rest areas, shops, cafes, fuel stations, and other infrastructure have been established along the motorway for the convenience of drivers and passengers.

The highway infrastructure includes several traffic police posts equipped with surveillance cameras, technical maintenance stations, and road service facilities.

A dedicated traffic management system collects data from surveillance cameras and meteorological stations and transmits it to road monitoring services.

The highway passes north through the Karakum Desert