The Bad Creek Hydroelectric Station is a pumped-storage hydroelectric power station located 8 miles (13 km) north of Salem in Oconee County, South Carolina.
The 1,065 megawatts (1,428,000 hp) power plant is owned by Duke Energy and its last generator was commissioned in 1991.
The power station generates electricity by shifting water between an upper and lower reservoir.
During periods of low energy demand, the four 266 megawatts (357,000 hp) Francis pump turbines pump water from Lake Jocassee which lies at an elevation of 1,110 feet (340 m) to the Bad Creek Reservoir at an elevation of 2,310 ft (704 m) through a 1 mile (1.6 km) tunnel.
The process is repeated as needed, primarily with the facility serving as a peaking power plant.