Balbina Dam

The Balbina Dam was built from 1985 to 1989 and is managed by Manaus Energia, under the Eletronorte system.

The dam has an installed capacity of 250 megawatts (340,000 hp) and floods a 2,360-square-kilometre (910 sq mi) area.

[1][2] The dam was established to provide a renewable electricity supply to the city of Manaus but was considered by locals a controversial project from the start, due to the loss of forest and displacement of tribal homes grounds.

[3] About 2,928.5 square kilometres (1,130.7 sq mi) of land formerly occupied by the Waimiri-Atroari was removed from the Waimiri Atroari Indigenous Territory and flooded.

[3] As a result of the methane released from its vast reservoir, proportional to its output, the Balbina Dam emits ten times more greenhouse gases than a coal plant.