Barbel-class submarine

Designed under project SCB 150,[2] the class overall was a somewhat smaller diesel-powered version of the Skipjack-class nuclear submarines, the first of which entered service only three months after Barbel, having been laid down only 11 days later.

Albacore's single-shaft configuration, necessary to minimize drag and thus maximize speed, was also adopted for the Barbels, Skipjacks, and all subsequent US nuclear submarines.

[2] For the first time, the Barbels also did away with the conning tower, instead combining the functions of attack center and control room into the same space, another feature adopted for all subsequent US submarines.

[2] Previous designs had routed the trim system piping through the control room, where the valves were manually operated.

This feature was standard on US Navy submarines until bow planes returned with the improved Los Angeles class, the first of which was launched in 1987.